• 澳门人·威尼斯(中国)官方网站

    SOLUTIONS&CASES
    解决方案&案例
    PPP Purchase Order of Shaoxing Circular Ecological Industrial Park (Phase I) Food Waste Treatment Plant
    Background
    a modern kitchen waste treatment plant with complete functions, advanced technology and beautiful environment will be buit through a variety of waste treatment and resource utilization technologies, and with the concept of circular economy, systematic planning and construction.
    Scheme
    Shaoxing project adopts kitchen-food waste co-treatment, mainly dealing with food waste, kitchen waste and wet waste: 400 t/d (including 200 t/d food waste and 200t/d kitchen waste). The main process is "pretreatment + anaerobic digestion", including pretreatment system of food waste, pretreatment system of kitchen waste, anaerobic fermentation system, biogas purification and utilization system, waste oil utilization system, biogas residue disposal system, etc.
    Achievements
    After pretreatment, food waste can produce about 5.62 t/d of crude oil; after anaerobic digestion, it can produce 23800 m3 of biogas per day, generating 43900 kwh/d.
    其他项目案例
    友情链接: